Our Solar Projects

Explore our portfolio of successful solar installations across Andhra Pradesh

Residential solar installation

5kW Residential Rooftop System

Nandyal, Andhra Pradesh

Completed: January 2025

A 5kW grid-tied solar system installed on a residential rooftop, providing 80% of the household's electricity needs.

Commercial solar installation

25kW Commercial Installation

Kurnool, Andhra Pradesh

Completed: February 2025

A 25kW solar system for a manufacturing facility, reducing their electricity costs by 60% and providing backup power.

Agricultural solar installation

10kW Solar Irrigation System

Nandyal District, Andhra Pradesh

Completed: March 2025

A 10kW solar-powered irrigation system for a 15-acre farm, eliminating diesel generator costs and providing reliable water supply.

Residential solar with battery backup

7kW On-Grid Home System

Kurnool District, Andhra Pradesh

Completed: April 2025

A 7kW grid-connected solar system for a residential home, providing reliable power supply and reducing electricity bills.

School solar installation

15kW School Installation

Nandyal, Andhra Pradesh

Completed: May 2025

A 15kW solar system for a local school, reducing electricity costs and providing educational opportunities about renewable energy.

Hospital solar installation

30kW Hospital System

Kurnool, Andhra Pradesh

Completed: June 2025

A 30kW solar system with battery backup for a hospital, ensuring critical equipment remains operational during power outages.

Customer Success Stories

Real results from our solar installations

90% Reduction in Electricity Bills

Residential Customer, Nandyal

Residential solar installation

"After installing a 5kW solar system from Kohinoor Solar, our monthly electricity bill dropped from ₹5,000 to just ₹500. The system has been running flawlessly for over a year now, and we couldn't be happier with the results."

Results:

  • 90% reduction in monthly electricity bills
  • ROI achieved in less than 4 years
  • Reliable power during grid outages

Powering Business Growth

Commercial Customer, Kurnool

Commercial solar installation

"Our manufacturing facility was facing frequent power outages and high electricity costs. Kohinoor Solar installed a 25kW system that has not only reduced our operating costs but also ensured continuous production. The system paid for itself in just 3 years."

Results:

  • 60% reduction in energy costs
  • Eliminated production losses due to power outages
  • Enhanced green credentials for the business

Ready to Start Your Solar Journey?

Join our growing list of satisfied customers